Skip to main content
Perlan Project
  • ABOUT
  • MISSIONS
  • AIRCRAFT
  • SCIENCE
  • EDUCATION
  • SPONSORS
  • DONORS
  • PROJECTS
  • TEAM
  • BLOG
  • PRESS
  • CONTACT

BRS installation

 

The Perlan 2 will have a ballistic recovery chute for emergency descent to the ground. The BRS strap has been installed on the fuselage prior to sending the fuselage to the paint shop.  BRS Aerospace has donated time and expertise to the design and installation.

The Trailer is on its way!

 

The Perlan trailer is finished and on its way to the port in Germany.

Perlan at Paris Airshow 2015

 

Thanks to Airbus, a model of the Perlan 2 was exhibited at the Pairis Le Bourget Airshow June 15-21, 2015. This model is now on permanent display at the Airbus Group Technology building. Here's just a few photos of the setup, before the public was allowed in on the first day.

 

 

Test fuselage tail boom joining

Wings Weighted after Painting

 

Wings and wing tips weighted.  June 8, 2015

Perlan 2 wings emerge from paint shop

 

Wings and allerons painted.              June 8, 2015

Perlan 2 set up in the shop

 

The Perlan II is set up in the RDD shop in Redmond, OR    - May 2015

Portland Mini Maker Fair 2014

 

The Portland Mini Maker Fair has come again. We were given the same booth that we had last year, so I think the Portlanders will be expecting us in the same place every year.

  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • next ›

© 2015-2019 Perlan Project Inc. All Rights Reserved

DONATE