Progress Inside the Cockpits

Sep 12, 2015 | Blog

On the morning of September 9, 2015, everyone in Redmond was working to assemble all the components.   Doug was arranging logistics. Morgan was working on final touches to software.  Eric and RDD folks are working on interior of cockpits – wiring, instruments, panels, and seat pans.

Stewart cleaned the protective adhesive off the windows and placed yellow soft microfiber cloths for protection during final installations. 

The rear seat pan was installed.

There is a ventilated rear hatch for ground and low altitude work. Jim worked on ventilation. The pressurized hatch will be used for any altitude work, of course. The new rudder pedals are installed in the front.

The front seat pan is now in:

and the front panel is in the cockpit:

Morgan and Stewart connected wires:

Recent Posts