Month: July 2009

Successful Window Test

Successful Window Test

As predicted last week, testing the window with full pressure and cold temperature has blown up the test box with no damage to the window. The test box was filled with offcuts of blue foam and sealed up. More blue foam was placed on top to hold the dry ice. The dry...

read more
First Pressure Test

First Pressure Test

We pressurised a test window for the first time today. We ran it up to the full design pressure although we did not test the (higher) proof pressure. There were no leaks and no problems with the window. I expect we will find that the window is unbreakable. The test...

read more
More Team Members Recognised

More Team Members Recognised

Jim Murray and Pat McLaughlin have been working on phase 2 of the project for several months now. We have only just gotten around to adding them to the “team” page on the web site. Patrick is the owner of Mountain High, which makes the best oxygen systems available...

read more
First test of Oxygen Rebreather

First test of Oxygen Rebreather

The rebreather oxygen system has been tested in a simple form. Jim Murray has put together a re-configurable system using simple plumbing parts. This allows us to test different configurations to work out which is best. The tests were very encouraging. The CO2...

read more

Recent Posts

Loading Day and Last Team Dinner

Loading Day and Last Team Dinner

Loading Day and Last Team Dinner With Monday morning’s sunrise the Perlan was in the trailer, the container was ready for inspection, the Egrett was ready to start the long ferry home, the Tribal truck was at the airport and the crane was booked for the afternoon. For...

Farewell Argentina 2023

Farewell Argentina 2023

Farewell Argentina Multiple weather studies for the next week did not show stratospheric waves of sufficient strength to soar to high altitude. So we made the tough, bittersweet decision to pack up and return to Minden. In El Calafate in 2023 Airbus Perlan Mission II:...

Perlan Support Teams – Part Three

Perlan Support Teams – Part Three

For the third and final blog on Support Teams for Airbus Perlan Mission II we look at several team members who wear many hats. Of special note are the words from our 3 Perlan Interns and their observations about their past two months in El Calafate. Argentine Liason –...

Perlan Support Teams – Part Two

Perlan Support Teams – Part Two

Perlan Support Teams – Part Two As I said in Part One we are so fortunate to have such diverse talent on our team to support Airbus Perlan Mission II. This blog is to highlight each team member’s supporting role in their own words. Most have been on multiple Argentina...

Month: July 2009